Reference for Avaya Communications DEFINITY G3
Following is an overview of the tasks required for starting the CallPath
Server for OS/2 subsystem and the DEFINITY G3 Switch Connection:
- Start the CallPath Server Management Facility
- Start the CallPath Server for OS/2 subsystem
- Start the DEFINITY G3 Switch Connection
These tasks are described in more detail in the following sections.
If you encounter errors or problems when trying to start the CallPath
Server for OS/2 subsystem, see the CallPath Server Planning,
Installation, and Problem Determination Guide.
Start the CallPath Server for OS/2 Management Facility by doing
one of the following:
- Type csasrvr at the OS/2 command prompt.
- Double-click the CallPath icon on the OS/2 desktop and then
double-click the CallPath Server for OS/2 icon.
After CallPath Server for OS/2 is started, the CallPath Server Management
Facility window and the Product Information window are displayed. Click
on OK to clear the Product Information window.
If password protection was enabled, the Administrative Password window is
also displayed and the password must be entered to gain access to the CallPath
Server Management Facility configuration functions.
To enter the password and gain access to the CallPath Server Management
Facility, do the following:
- Type the password, then click OK.
- Note:
- The default password, until you change it, is password.
- Click on OK in the CallPath Server Management Facility Product
Information window to access the CallPath Server Management Facility
window.
See the CallPath Server Planning, Installation, and Problem
Determination Guide for a description of the CallPath Server Management
Facility window and how to use the window's features.
After starting the CallPath Server Management Facility, start the CallPath
Server for OS/2 subsystem in one of the following ways:
- From the CallPath Server Management Facility window:
- Select the Administration menu option from the menu bar.
- Select the Server menu option.
- Select Start.
- Click on one of the following in response to the confirmation
message:
- Yes to start the CallPath Server for OS/2 subsystem
- No to return to the CallPath Server Management Facility window
without starting the CallPath Server for OS/2 subsystem
- From the CallPath Server icon:
- Click the CallPath Server icon.
- Select Start.
- Click on one of the following in response to the confirmation
message:
- Yes to start the CallPath Server for OS/2 subsystem
- No to return to the CallPath Server Management Facility window
without starting the CallPath Server for OS/2 subsystem
If you cannot start the CallPath Server for OS/2 subsystem, see the
CallPath Server Planning, Installation, and Problem Determination
Guide.
Start the DEFINITY G3 Switch Connection in one of the following
ways:
- From the CallPath Server Management Facility window menu bar:
- Select the Administration menu.
- Select the Switch Connection menu option.
- Select Start.
- Select the switch.
- Click on one of the following in response to the confirmation
message:
- Yes to start the switch
- No to return to the CallPath Server Management Facility window
without starting the switch
- From the CallPath Server Management Facility window switch
icon:
- Click the Switch icon.
- Select Start.
- Click on one of the following in response to the confirmation
message:
- Yes to start the switch
- No to return to the CallPath Server Management Facility window
without starting the switch
[ Top of Page | Previous Page | Next Page | Table of Contents | Index ]