System Management Guide


 Return to Library  Contents  Previous Topic  Bottom of Topic  Next Topic  Index  Help


Part 2. Installation

 

This part of the book is about installing CallCoordinator in your call center.

Partial Table-of-Contents

  • Chapter 10. Installation, Configuration and Verification Tasks
  • About the Test Environment
  • About Your Production Environment
  • Chapter 11. Preparing For Installation
  • The Installation Task Sequence
  • Hardware and software requirements
  • Prerequisite Tasks
  • What You Need for the CICS Test Environment
  • Reference Material
  • Chapter 12. Loading the CallCoordinator software
  • Naming Conventions
  • About the Program Directory
  • Software Load Sequence
  • Printing Copy Code and Sample Programs
  • Chapter 13. About CallCoordinator Software
  • The CallCoordinator CICS Environment
  • MRO Environment
  • Sysplex Environment
  • About the CallCoordinator CICS Definitions
  • The High-Level Qualifier
  • Types of CICS Region
  • Types of Definition
  • Chapter 14. Defining CallCoordinator to CICS for SRO
  • Task Overview for Single Region Operation
  • Limiting Access to System Administration Functions
  • Recommendations for System Initialization Table (SIT)
  • Storage Requirements
  • Using Macro Tables to Define CICS Resources
  • Assembling and Linking CICS Macro Tables
  • Defining Destination Control Table (DCT) Entries
  • Defining Program List Table (PLT) Entries
  • Defining Journal Control Table (JCT) Entries
  • Defining Temporary Storage Table (TST) Entries
  • RDO to Define CICS Resources for SRO
  • Customizing a Job
  • Creating the VSAM Data Sets
  • Allocating and Initializing VSAM Data Sets (CAMKALLJ)
  • Migrating VSAM Data Sets (CAMKMIGJ)
  • Creating User Journals for Tracing
  • Creating Trace User Journals for CICS V4.1
  • Creating Trace User Journals for CICS TS 1.2 and TS 1.3
  • Creating User Journals for MIS Logging
  • Creating MIS User Journals for CICS V4.1
  • Creating MIS User Journals for CICS TS 1.2 and TS 1.3
  • Allocating Customization PDS
  • Installing CallCoordinator Node Error Program Logic
  • Including CallCoordinator VSAM Data Sets in Your CICS Startup JCL
  • Concatenating Load Libraries in Your CICS Startup JCL
  • Recycling the CICS Region
  • Chapter 15. Defining CallCoordinator Software to CICS for MRO
  • Customizing CICS Table Entries for MRO
  • Defining Programs and Transactions for MRO Using RDO
  • Incorporating the CallCoordinator COR in your MRO
  • Defining CallCoordinator in the User AORs
  • Defining CallCoordinator in the TORs
  • Chapter 16. Defining to CICS for Sysplex Operation
  • Defining the Shared TSQ Structure to the Coupling Facility
  • Defining the Coupling Facility Data Table Structure
  • Installing CICS Resources in the AORs (SYSPLEX)
  • Installing CICS Resources in the TORs (SYSPLEX)
  • Installing CICS Resources in Other CORs (SYSPLEX)
  • CallCoordinator COR in Sysplex Environment
  • Defining CallCoordinator in the User AORs
  • Defining CallCoordinator in the TORs
  • Chapter 17. Validating Software Load and Definition to CICS
  • About the Software Validation Program
  • Accessing and Running the Validation Program
  • Message Output from the Validation Program
  • Chapter 18. Getting Ready for Configuration
  • Prerequisite Equipment
  • Prerequisite Information
  • Prerequisite Tasks
  • About Configuring the Test Environment
  • Transaction IDs to Use with the Installation Verification Program
  • CallCoordinator Configuration for the Test Environment
  • Additional CallCoordinator Configuration for Transfer Load Balancing
  • Switch Configuration for the Test Environment
  • The Product Defaults
  • Information for Test Personnel
  • Chapter 19. How to Use the CallCoordinator Panels
  • Who Uses the Panels
  • The Panel Types
  • The CallCoordinator System Administration Panels
  • The Installation Verification Program Panels
  • The CallCoordinator Agent Panels
  • How to Use the Panel Functions
  • How to Move the Cursor
  • How to Use the Position to Field
  • How to Use the More Field
  • How to Use the Option field
  • How to Use the Action Field
  • How to Use the Function Keys
  • How to Use the Choice Symbol to Select an Object
  • How to Enter Information on the Panels
  • Replacing the Number Sign with the Ampersand
  • Input Field Classifications
  • The CallCoordinator Symbol for a Default Value
  • Enterable and Non-enterable Fields
  • When You Can Change Information on a Panel
  • How to Use Online Help
  • How to Use the Function Keys on the Help Panels
  • Chapter 20. Configuring System Administration
  • Configuration Overview
  • Shutting Down CallCoordinator
  • Setting Table Sizes
  • Defining COR Recovery Policy
  • Defining Switches to CallCoordinator
  • Configuring the General System Settings
  • Configuring the CallCoordinator Telephony Settings
  • Defining Agents, Extensions, and Position IDs
  • Defining Agent for TLB Verification
  • Adding Other Resources to be Monitored by CallCoordinator
  • Chapter 21. Configuring Intelligent Answering
  • About Intelligent Answering
  • Configuring the DNIS to Application panel
  • Configuring the Trunk to Application panel
  • Configuring the Pilot to Application Panel
  • Chapter 22. Configuring Transfer Load Balancing
  • Configuration Overview
  • Accessing the Transfer Load Balancing Main Panel
  • Defining the Load Balancing Functions
  • Setting Balance Points
  • Defining Switch-to-switch Dialing Prefixes
  • Defining the Inter-switch Tracking Numbers
  • Chapter 23. Preparing for Installation Verification
  • Prerequisite Personnel and Equipment
  • Prerequisite Information
  • Using the Installation Verification Program
  • About the IVP Intelligent Answering Panel
  • Description of Fields on the Intelligent Answering Panel
  • The Transaction IDs for the Intelligent Answering Panel
  • How to Use the IVP to Verify Intelligent Answering
  • How to Use the IVP to Verify Coordinated Voice and Data Transfer
  • How to Use the IVP to Verify Transfer Load Balancing
  • Chapter 24. Verifying CallCoordinator Installation
  • Verifying that CallCoordinator is Operational
  • Checking Switch Status
  • Starting Up CallCoordinator
  • Signing On to CallCoordinator
  • Verification Procedures for Intelligent Answering
  • Verifying an ANI Call
  • Verifying a Call to an Agent Extension
  • Verifying a Call to an ACD Dedicated Trunk
  • Verifying a Distribution Group Pilot Extension Call
  • Verifying a Call to a DNIS Number
  • Verification Procedure for Coordinated Voice and Data Transfer
  • Making a Telephone-Initiated Call Transfer
  • Making a System Call Transfer
  • Verification Procedures for Transfer Load Balancing
  • Signing off as Agents

  •  Return to Library  Contents  Previous Topic  Top of Topic  Next Topic  Index  Help